SES Techcom
Wholly-owned subsidiary of SES S.A. delivering end-to-end satellite-enabled solutions to governmental, institutional and supranational customers. Prime contractor and operator for EAGLE-1, a sovereign LEO quantum-key-distribution satellite (announced as Europe's first; ~€130M, ESA + European Commission + a consortium of 20+ European companies, Vega-C launch from Kourou in late 2026 / early 2027). Also leads the Luxembourg national quantum-communication infrastructure (LuxQCI) consortium under the EuroQCI programme.
Timeline
Current flagship
EAGLE-1 — LEO QKD pathfinder satellite (Tesat SCOT80 payload on SITAEL platform), late-2026 / early-2027 launch
Milestones
- 2025-05Eagle-1 system description published (arXiv:2505.20838) — full mission, payload, and ground-segment architecture made public
- 2023-09SES selects Arianespace for Eagle-1 launch on Vega-C from Kourou
- 2023-05SES + Tesat-Spacecom partnership announced — Tesat to develop and integrate the EAGLE-1 QKD payload (SCOT80 + QKD module)
- 2022-10ESA + European Commission + SES Techcom sign the Eagle-1 project agreement at the IAC in Paris; SITAEL contracted for the satellite platform
- 2021-07SES-led consortium awarded LuxQCI design — Luxembourg national segment of EuroQCI (InCert, itrust, LuxConnect, LuxTrust, Uni Luxembourg / SnT under SES Techcom lead)
Roadmap
- 2026 Eagle-1 satellite delivery, environmental test, ship to Kourou for Vega-C launch (late 2026 / early 2027) source ↗
- 2027 Eagle-1 commissioning and start of three-year in-orbit QKD validation mission with European optical ground stations source ↗
- 2030 Follow-on European QKD constellation building on Eagle-1 results, integrated with EuroQCI national segments and IRIS² secure connectivity source ↗
Capability details
QKD
- Protocols
- BB84, decoy-state
- Rate vs distance
- C-band optical downlink from LEO via Tesat SCOT80 terminal; phase-encoded double-pulse qubits to European ground stations (3-year in-orbit validation post-launch)
Networking
- Role
- orchestrator
- Products
- EAGLE-1 ground segment — optical ground stations across Europe, key-management infrastructure linking national EuroQCI segments, LuxQCI architecture and operations
3 unverified fields
-
key_personnel.1.name -
key_personnel.1.since -
modalities.qkd.rate_distance— detailed key-rate vs slant-range numbers for Eagle-1 are not yet public; description is qualitative pending in-orbit data
People
References
- preprint https://arxiv.org/abs/2505.20838 The European Satellite-Based QKD System EAGLE-1 (May 2025) — canonical mission paper
- press https://www.esa.int/Applications/Connectivity_and_Secure_Communications/Eagle-1 ESA Eagle-1 programme page
- press https://www.ses.com/newsroom/eagle-1-advancing-europes-leadership-quantum-communications SES newsroom — Eagle-1 strategic context
- press https://newsroom.arianespace.com/ses-selects-arianespace-to-launch-eagle-1-satellite-for-europes-quantum-cryptography/ Arianespace launch-service contract announcement (Sep 2023)
- press https://www.businesswire.com/news/home/20210712005866/en/SES-led-Consortium-to-Define-Luxembourg%E2%80%99s-Quantum-Communication-Infrastructure-for-Europe LuxQCI consortium award (July 2021)